
a world leading campus
BSL Restelo (Phase I). Now open.
PHASE ONE
COMPLETED
Phase I of our state-of-the-art campus opened in September 2024, welcoming secondary students. The facilities include bright, spacious classrooms, fully equipped science labs, and a variety of play areas and sports fields for our students to enjoy.
Phase II is expected to be completed by the summer of 2025.
PHASE II Summer 2025
state-of-the-art building:
over 6000 sq metres of landscaped outside recreational and learning spaces
thoughtfully designed specialist facilities, including science labs, a design & technology suite and a large library with panoramic views
extensive sports facilities, including an indoor multi-purpose hall




prime location in the heart of the embassy district
12 minutes from our Cais Do Sodré campus and 25 minutes drive from Cascais, located within the Os Belenenses football complex.
